Project information
Project description
achie Training Centre for the Disabled
Was build by Ghana society of the physically disabled. On 7th Dec 1984. Objective : To train persons with disabilities in technical and vocational skills. Now we train both the Disabled and the able bodies.
Was build by Ghana society of the physically disabled. On 7th Dec 1984. Objective : To train persons with disabilities in technical and vocational skills. Now we train both the Disabled and the able bodies.
Number of students
95
Number of teachers
22
Number of dootronics needed
25
Number of dootronics delivered
25
Number of dootronics remaining
0
Number of dootronics in transit
0
Dootronics additional notes
Requested but not accepted
5.1 Number of Laptops needed(*): 40
5.2 Number of eBook Reader needed: 20
5.3 Others needed (Tablet-PCs etc): 10
5.1 Number of Laptops needed(*): 40
5.2 Number of eBook Reader needed: 20
5.3 Others needed (Tablet-PCs etc): 10
Coordinating hub(s)
On-site point of contact
Fatawu Fuseini
Project application
Geographic information
Local language(s)
English
Location
6.477771, -1.435866
6.477771, -1.435866
6.477771, -1.435866
Country
Ghana
Technical information
Internet connection type
Wired or Wireless