Project information
Project description
              achie Training Centre for the Disabled
Was build by Ghana society of the physically disabled. On 7th Dec 1984. Objective : To train persons with disabilities in technical and vocational skills. Now we train both the Disabled and the able bodies.
          Was build by Ghana society of the physically disabled. On 7th Dec 1984. Objective : To train persons with disabilities in technical and vocational skills. Now we train both the Disabled and the able bodies.
Number of students
              95
          Number of teachers
              22
          Number of dootronics needed
              25
          Number of dootronics delivered
              25
          Number of dootronics remaining
              0
          Number of dootronics in transit
              0
          Dootronics additional notes
              Requested but not accepted
5.1 Number of Laptops needed(*): 40
5.2 Number of eBook Reader needed: 20
5.3 Others needed (Tablet-PCs etc): 10
          5.1 Number of Laptops needed(*): 40
5.2 Number of eBook Reader needed: 20
5.3 Others needed (Tablet-PCs etc): 10
Coordinating hub(s)
          
      On-site point of contact
              Fatawu Fuseini
          Project application
              
          Geographic information
Local language(s)
              English
          Country
              غانا
          Technical information
Internet connection type
          Wired or Wireless
              
Edit this edoovillage
Next edoovillage
Previous edoovillage
        


        