Project information
Project description
              Die Hupendo-Schule hat inzwischen 450 Schüler, angefangen vom Kindergartenalter bis zur 12. Klasse. 2010 konnte für die Hupendo-school das Grundstück vom dortigen Landlord gekauft werden. Sofort begann man neue Schulklassen in Festbauweise zu bauen.Jetzt sind alle Klassenräume fertig.2011 wurde eine große Toilettenanlage und 2012 die Küche + Vorratsraum gebaut.
Der Physikraum wird zur Zeit ausgestattet. Jetzt werden Computer für den EDV-Raum benötigt.
Januar 2018: Erhöhung auf 570 Schüler*innen und 19 Lehrer = + 10 Laptops
---------
The Hupendo school has 450 students today, from kindergarten age through to 12th Class. 2010 the land was bought from the local landlord for the property of Hupendo-school. Immediately new class rooms were started, in solid construction.Now all classrooms are ready.2011 a large toilet facility and in 2012 the kitchen + pantry were built .
The Physics Room is equipped now. Now computers are needed for the computer room.
          Der Physikraum wird zur Zeit ausgestattet. Jetzt werden Computer für den EDV-Raum benötigt.
Januar 2018: Erhöhung auf 570 Schüler*innen und 19 Lehrer = + 10 Laptops
---------
The Hupendo school has 450 students today, from kindergarten age through to 12th Class. 2010 the land was bought from the local landlord for the property of Hupendo-school. Immediately new class rooms were started, in solid construction.Now all classrooms are ready.2011 a large toilet facility and in 2012 the kitchen + pantry were built .
The Physics Room is equipped now. Now computers are needed for the computer room.
Number of students
              570
          Number of teachers
              32
          Number of dootronics needed
              30
          Number of dootronics delivered
              26
          Number of dootronics remaining
              4
          Number of dootronics in transit
              0
          Coordinating hub(s)
          
      On-site point of contact
              Alfred Nyerer, director
          Project application
              
          Geographic information
Local language(s)
              English
          Country
              Kenya
          Technical information
Socket voltage
              220-240 Volts
          Socket type
          D
          G
              Internet connection type
          Wired or Wireless
              
Edita aquesta edoovillage
Propera edoovillage
Anterior edoovillage
        


        
      
      
      
      
      
      
      
      
      
      
      